Land Surveying Projects
  • Prineville Solar Site

This project entailed mapping and staking 90,000 plus pier points on the Prineville – Millican Solar Site Southwest of Prineville. Work was performed in 2020.


  • Mountain Glen A.L.T.A.

This project entailed doing a complete survey to A.L.T.A. standards for the Mountain Glen Apartments in Heppner, Oregon. Work included boundary surveying and a complete A.L.T.A. of existing structures and all appurtenances for financing purposes. Work completed in 2020.


  • U.S. Forest Service Cadastral Surveys

We are currently involved in multiple Cadastral Surveys on the Ochoco, Deschutes and Fremont – Winema National Forests. This work entails G.L.O. corner search and monumentation, boundary resolution, line posting and clearing and required mapping and form deliverables.


  • Port of Morrow

We have completed multiple Partition Plats, Road Dedication surveys and topographical surveys for the Port of Morrow and the subsequent businesses moving to the port in 2020 and 2021.


  • Pacificorp

In 2020 we completed 10 projects for Pacificorp across the State of Oregon. These projects included topographical surveys for transmission line construction and substation expansion, transmission line staking, easement legal description descriptions, F.A.A. permit ties and two plats.


  • Windwave Fiber Optic Communications

We have completed multiple as-built tied legal descriptions and exhibit maps for Windwave in multiple locations along the Columbia River Corridor during 2020 and 2021.


  • Gilliam County

This work was performed on the Shutler Station Industrial Park near Arlington. The work included a detail site survey and a topographic site survey of the entire Industrial Park, consisting of around 85 acres. The site survey was a detail survey of every existing feature located on the Industrial Park. Work was performed in 2009.


  • Gilliam County Road Department

The work was performed at the Shutler Station Industrial Park near Arlington. The work consisted of construction staking for a large storm water retention pond. Work was performed in 2009.


  • Columbia Basin Electric

This project entailed a strip topographic survey of 3.0 mile power line route near the Gilliam County Landfill. Work was performed in 2009.


  • Bonneville Power Administration

This project entailed completing the planning requirements and a Boundary line adjustment survey for the Jones Canyon Substation. Work is currently being performed.


  • Pillar Consultants

We have performed several topographic surveys, boundary survey and a construction staking project in Condon, Oregon for Pillar Consultants an engineering firm located in Condon, Oregon. Work performed in 2009.


  • High Energy

This work was performed on a proposed Pacific Power substation site in the City of Prineville. The work included boundary survey, topographic survey including utility location in surrounding area for development of the Barnes Butte Substation. This work was performed for the engineering firm designing the facility. Work was performed in 2009.


  • Hinkle Substation to Hermiston

This project entailed topographic survey of a 4.8 mile power line route between the Hinkle Substation and Hermiston including crossing details for other utilities including railroad yards. The work also included boundary survey of the substation site. The work included legal descriptions for rights of way and facilities. Work was performed in 2008.


  • Prineville to Pioneer Substation

This project entailed topographic survey of 8.6 mile power line route including crossing details for other power lines, utilities and highways. The work included legal descriptions for rights of way. Work was performed in 2008.


  • Davis Loop Power Line

This project entailed topographic route survey of 2.0 miles of existing power line and alternate route for realignment and rebuilding of power transmission line. Work included legal descriptions for rights of way including deed research and retracement of record documents. Work also included construction staking for the rebuild. Work completed in 2008.


  • Robberson Ford ALTA Surveys

This project entailed complete survey to ALTA standards for the Robberson Ford facilities on their plant sites on four properties located in Bend and Prineville. Work included boundary survey and complete ALTA of existing structures and all appurtenances for financing purposes. Work completed in 2007.